Atlanta Hartsfield ATLNext Development Program

Central Terminal Complex

Roadway Canopy – Domestic Departures and Arrivals scope that included Head-house Structural modifications, renovations to Building Ventilation, Entrance vestibules, Exterior facade, Curbside check-in, Roadway Lighting, with Air pillow canopy and integrated lighting system

Elevated Pedestrian walkways – Domestic Departures level scope included installation of 4 walkway systems with structural modifications to Head-house, site work to support steel with connection to Roadway canopy and Parking decks

Security Checkpoint Expansion – South Checkpoint expansion demolition of Delta Check-in zone expansion to 10 lanes and Secure Exit Lanes

Ride Share – Relocation established dedicated location on Arrivals level with covered pedestrian canopies. Dedicated Ride Share Geo-fenced Hold lot with Uber/Lyft driver release system

Concourse T – 5 gate building extension with enabling scope – the demolition of Delta GSE Shop, Fire Station, Parking as well as rerouting Departures and Arrivals exit roadways

Plane Train Tunnel Extension – Program to facilitate additional train capacity that includes complex modifications to Headhouse, track, tunnels and vertical circulation as well as enabling work for new Hotel

Life Safety – Fire Alarm system upgrades at each Concourse to consolidate and centralize alarm reporting, expand deployment of AED blood response kits

Southwest Airlines GSE – Ground Service Equipment site centralization electrical, trash compactor, paving, parking and safety striping at Concourse C

Airport Facility

Aircraft Deicing Facility Site (Southside) – New facility for south side aircraft deicing operations included equipment fueling, equipment parking, glycol and deicing material delivery, storage as well as employee support space. Extensive Ramp scope with installation of underground glycol recovery system and associated storage recovery tanks, ramp video monitoring system, FAA aircraft movement plan, aircraft hardstand positions

Delta GSE Shop Relocation -Terminal 5 Enabling scope project providing site prep including site excavation, rock blasting removals, establishing new access roadways, new LOD Fencing, subterranean boring – connections for power, communication and Airport security

Southwest Airlines Cargo

+ Facility Roof Replacement program – New Lighting, Rubb roof system replacement planning with FAA, Delta Airlines coordination

+ Facility parking and trucking access – Security change to establish one way access and exit, address frontage GDOT roadway safety requirements with guard rail installation

Parking

Seven level garage – with automated space availability by level and pedestrian bridge connection to Airport shuttle train station.

Park and Ride Lot – facility that includes Vehicle covered and Truck parking spaces

Airside

Fuel system underground Casing repairs with taxiway closures and restrictions

End Around Taxiway – Planning activities, coordination with Airlines as well as FAA to facilitate enhanced aircraft movement to reduce aircraft taxiway and runway crossovers

Pavement planning program – Taxi and Runway full replacement with 24 hour a day paving operation to minimize Airport operational impact

Exterior painting of all Concourses of Central Terminal Complex

Jet Bridge Replacement – Phased program to replace 139 end of life Jet bridges in coordination with FAA, Operations and Airlines

Maintenance programs – Airfield Striping, Runway Rubber Removal, Lighting systems, Erosion control with FAA controlled movement restrictions and shutdowns

Emergency Power Generation – planning to locate gas powered generators to supply emergency backup power at each Concourse with coordination of install by Georgia Power and Light

Community

Noise Insulation Program – Airport sponsored program to provide aircraft noise reduction treatment to facilities in close proximity to airport boundaries